Repair of 3 Superheaters, Ashkelon / Hadera
Client: Israel Electric Co.
SOW:
Replacement of piping system inside the evaporator for 560MW steam boiler.
Assembly and welding of wall tubes with alloy material.
Special work on heights.
Period: 2020-2021